Container Guide · Stowage planning

How to create a container stowage plan

A stowage plan shows which package sits where in the container — a drawing plus a list. It answers three questions at once: does it all fit, how is it loaded and what should the consignee expect. With the 3D calculator it comes out of your cargo dimensions, without Excel and without a drawing program.

What belongs in a stowage plan

There is no standard for it — but there is a consensus about what it has to deliver. A usable stowage plan states:

What a geometric stowage plan is not: a load securing calculation. Lashings, friction coefficients, centre of gravity and axle loads are not in it and have to be checked separately. Mixing the two sells a drawing as a safety certificate.

Four steps to a stowage plan

StepWhat happens
1. Pick the containerA type from the list or your own dimensions; optionally the carrier's internal dimensions.
2. Enter the cargoPosition by position — or paste the packing list from Excel, columns are detected.
3. Let it calculateThe packer searches for the arrangement, the result stands next to it live in 3D.
4. Pass it onAs a link, an image, or a printable loading plan with a QR code back to the 3D plan.

Stackability is where most stowage plans run out of air

A plan that treats every package as freely stackable looks good and is worthless at the loading dock. So each position carries what it actually takes:

The calculator takes these per position and sticks to them — even when less fits as a result. A longer package is not placed on a shorter one so that it ends in mid-air at the edge: what sits on top has to stand on something.

When it turns into more than one container

That is not an error, it is a result. The calculator then says how many containers it takes, distributes the cargo across them and reports volume and weight per container — each one is placed, weighed and hauled separately, after all. The weight is levelled as evenly as possible without needing one container more than necessary.

Passing the plan on

Three formats, depending on who gets it:

FormatWhat for
LinkThe recipient opens the same 3D plan in the browser and can rotate it — no sign-up.
Image (PNG)For email and quotations: the view plus the figures per container.
Loading plan (PDF)To print for the dock, with a QR code back to the interactive plan.

Frequent questions

What is a stowage plan?
A representation of which packages are loaded into a container in which arrangement — a drawing plus a position list with dimensions, weights and totals.

Who prepares the stowage plan?
Usually the shipper or the forwarder who packs. For groupage it is the container packing station; for FCL shipments often the shipper themselves.

Is a stowage plan mandatory?
Not generally — the VGM declaration is. In practice consignees, customs and insurers ask for one regularly, because it documents what was in the container and how it stood.

Free, no sign-up — enter the dimensions, pass the plan on as a link, image or PDF.

Related questions

No warranty: The stowage plan produced is a purely geometric estimate to prepare a booking. It contains no check of axle load, centre of gravity or load securing and is not a certificate under VDI 2700 or the CTU Code. Statements on VGM and documentation duties reflect publicly available sources and are not legal advice.